Designed by Hands That Know

At 81 years old, Jim Bishop wasn't looking to start a company. He was just trying to live his life with dignity.
A veteran of Texas state government and a man who nearly took a company public before 9/11 changed everything, Jim knew what it meant to solve hard problems. But arthritis presented a different kind of challenge—one that existing solutions completely failed to address.
Every cane holder on the market required the very thing arthritis takes away: grip strength and dexterity. Rubber hooks that wouldn't grip. Clips that wouldn't close. Velcro that degraded. It was maddening.
So Jim did what engineers do: he refused the constraint. Working with his partner Sean Davenport, he designed something entirely new—a cane holster that works with arthritic hands, not against them.
"This isn't just about holding a cane. It's about holding onto your independence. Every small freedom matters when you're fighting to maintain your dignity."
— James W. Bishop Jr., Founder
Today, Bishop Mobility Solutions carries forward that same philosophy: mobility aids should actually aid mobility. They should be engineered with empathy, built with precision, and designed to restore—not diminish—the independence of those who use them.
Years of life experience informing every design decision
Protecting truly innovative assistive technology
Engineered and manufactured in the USA


